Stairs That Grip Under Every Condition

Anti-Slip Epoxy & Stair Tread in Bridgeton for basement stairs, garage steps, and commercial entryways where worn treads cause falls

Basement stairs in older homes, garage steps exposed to oil and moisture, and commercial entryways in retail and food service buildings often have smooth concrete or painted treads that become dangerously slick when wet, worn, or contaminated. Durashield LLC installs anti-slip epoxy coatings and stair tread systems in Bridgeton and throughout South Jersey, broadcasting aggregate into the wet epoxy to create a consistent grip that holds under foot traffic, weather, and spills. Both owners work the floor on every job, so the slip-resistance you are paying for is applied by the people accountable for it, and the grit is broadcast and cured to a uniform texture rather than applied unevenly by a subcontractor.


The crew begins by grinding or preparing the existing tread to remove any old finish, paint, sealers, or contamination that would prevent the epoxy from bonding, then applies a primer matched to the substrate condition. Once the primer cures, an epoxy base coat is applied to each tread, and while the epoxy is still wet, aggregate grit is broadcast across the surface to set the texture. After the grit is locked in, a topcoat is applied to seal the aggregate and protect it from abrasion and moisture. Stair nosings are masked so the line between the tread and the riser stays clean and professional. The price depends on the number of treads, the condition of the existing surface, and whether removal of an old coating is required before the new system can be installed.


Arrange an on-site assessment to review tread condition and determine whether surface removal is needed before coating.

What Proper Stair Coating Requires

Anti-slip coatings are only as durable as the surface they are bonded to, so proper tread preparation is not optional—it determines whether the system lasts years or fails within months. The existing tread is mechanically abraded to open the pores of the concrete or to remove any existing finish, and the surface is inspected for cracks, spalling, or damage that would telegraph through the coating. Owner-operators bring a fully equipped trailer to handle surface prep and coating on site without returning to the job.


Once the coating cures, you will notice that the tread surface has a consistent, rough texture that grips underfoot even when wet, the nosing edge is clearly defined, and the coating does not peel or bubble at the edges. The aggregate is locked into the epoxy rather than sitting on top of it, so the texture does not wear smooth under traffic as quickly as paint-and-grit products.


The work includes grinding or preparation of the existing tread, priming, base coat, aggregate broadcast, and topcoat, but it does not include repair of cracked or broken treads, which are assessed and quoted separately. If the stairs have metal nosings or are subject to heavy industrial traffic, a higher-durability system or additional topcoats may be recommended.

Common Questions About This Service

Stair tread coating involves surface preparation, material selection, and texture standards, and property owners in Bridgeton and Millville often ask about durability, preparation steps, and what changes after the coating is applied.

  • What happens if the existing tread is painted or sealed?

    Paint and sealers are mechanically removed by grinding or scarifying the tread down to bare concrete, because epoxy will not bond reliably to a smooth or contaminated surface and will delaminate under foot traffic if the old finish is left in place.

  • How is the texture of the anti-slip surface controlled?

    The texture is controlled by the size and volume of aggregate broadcast into the wet epoxy—finer grit produces a smoother feel with moderate slip resistance, while coarser grit creates a more aggressive texture suited to outdoor or industrial stairs.

  • Why are stair nosings masked during application?

    Masking the nosing creates a clean, straight edge where the tread meets the riser, preventing epoxy from dripping or smearing onto the vertical surface and ensuring the finished stair looks deliberate rather than sloppy.

  • How long does the coating take to cure before the stairs can be used?

    Most epoxy stair systems cure to foot traffic within 24 hours and to full use within 48 to 72 hours, depending on the product, temperature, and humidity at the time of application.

  • What should you check after the coating is finished?

    Check that the aggregate texture is uniform across all treads, that the nosing edge is straight and free of drips, and that the coating is fully adhered with no soft spots, bubbles, or peeling at the edges.

Durashield LLC also installs anti-slip epoxy and stair tread systems in Atlantic City, Bensalem, Berlin, Brick, and Burlington. The same crew handles surface prep, coating, and aggregate broadcast on every job, so there is no variation in texture or quality from one tread to the next.